In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is considered non-value-added lead time?


A) packing
B) moving from process to process
C) converting raw materials to finished product
D) all of these choices

E) B) and D)
F) C) and D)

Correct Answer

verifed

verified

Schedule of Activity Costs Schedule of Activity Costs   ​ -From the provided schedule of activity costs, determine the prevention costs. A) $30,000 B) $74,000 C) $76,000 D) $104,000 ​ -From the provided schedule of activity costs, determine the prevention costs.


A) $30,000
B) $74,000
C) $76,000
D) $104,000

E) A) and C)
F) None of the above

Correct Answer

verifed

verified

Long setups and large batch sizes result in smaller inventories and reduced lead times.

A) True
B) False

Correct Answer

verifed

verified

A setup is the effort spent preparing an operation or process for production.

A) True
B) False

Correct Answer

verifed

verified

Push manufacturing is also referred to as "make to order" processing.

A) True
B) False

Correct Answer

verifed

verified

Match each of the following quality control activities with the appropriate classification (a or b). -Processing returned materials A)Value-added B)Non-value-added

Correct Answer

verifed

verified

Which of the following is related to long lead times?


A) long setup times
B) large batch sizes
C) large inventories
D) all of these choices

E) B) and D)
F) A) and D)

Correct Answer

verifed

verified

Match each of the following activities with the appropriate quality cost classification (a-d). -Recalling defective products A)Prevention cost B)Appraisal cost C)Internal failure cost D)External failure cost

Correct Answer

verifed

verified

Conan Electronics Corporation manufactures and assembles electronic motor drives for video cameras. The company assembles the motor drives for several accounts. The process consists of a lean cell for each customer. The following information relates to only one customer's lean cell. For the year, planned labor and overhead was $80,000,000 and materials costs were $25 per unit. Planned production included 9,600 hours to produce 76,800 motor drives. Actual production for the month of August was 5,200 units, and motor drives shipped amounted to 5,040 units. From the foregoing information, determine the cell conversion cost rate for applying conversion costs.


A) $8,025 per hour
B) $800 per hour
C) $7,200 per hour
D) $8,333 per hour

E) A) and C)
F) A) and D)

Correct Answer

verifed

verified

Schedule of Activity Costs Schedule of Activity Costs   ​ -From the provided schedule of activity costs, determine the value-added costs. A) $177,000 B) $191,000 C) $156,000 D) $104,000 ​ -From the provided schedule of activity costs, determine the value-added costs.


A) $177,000
B) $191,000
C) $156,000
D) $104,000

E) A) and C)
F) A) and B)

Correct Answer

verifed

verified

Squirrel Co. operates in a lean manufacturing environment. For June production, Squirrel purchased 6,000 units of raw materials at $6.00 per unit on account. The journal entry required to record this transaction is


A) Squirrel Co. operates in a lean manufacturing environment. For June production, Squirrel purchased 6,000 units of raw materials at $6.00 per unit on account. The journal entry required to record this transaction is  A)   B)   C)   D)
B) Squirrel Co. operates in a lean manufacturing environment. For June production, Squirrel purchased 6,000 units of raw materials at $6.00 per unit on account. The journal entry required to record this transaction is  A)   B)   C)   D)
C) Squirrel Co. operates in a lean manufacturing environment. For June production, Squirrel purchased 6,000 units of raw materials at $6.00 per unit on account. The journal entry required to record this transaction is  A)   B)   C)   D)
D) Squirrel Co. operates in a lean manufacturing environment. For June production, Squirrel purchased 6,000 units of raw materials at $6.00 per unit on account. The journal entry required to record this transaction is  A)   B)   C)   D)

E) B) and D)
F) All of the above

Correct Answer

verifed

verified

In a lean environment, operations only respond to customer orders.

A) True
B) False

Correct Answer

verifed

verified

From the foregoing information, determine the production costs transferred to Finished Goods during August.


A) $369,840
B) $408,480
C) $428,800
D) $473,600

E) All of the above
F) A) and D)

Correct Answer

verifed

verified