Core acquisition yield rate is the primary source of remanufacturing complexity.Among following uncertain factors, choose the ones that influence the yield rate in a significant manner. 1) Quality 2) Timing 3) Cost 4) Quantity


A) (1) and (3)
B) (2) and (4)
C) (1) , (2) , and (4)
D) None of the above

E) A) and C)
F) B) and C)

Correct Answer

verifed

verified

C

Define what a core is and describe how a core moves along the remanufacturing process.

Correct Answer

Answered by ExamLex AI

Answered by ExamLex AI

A core is the used or worn-out part of a...

View Answer

The remanufacturing process can be described as the flow of cores.Please elaborate about this but do not go over a paragraph.

Correct Answer

Answered by ExamLex AI

Answered by ExamLex AI

The remanufacturing process can be described as the flow of cores, which involves the disassembly, cleaning, inspection, repair, replacement, and reassembly of used products or components to meet the same specifications as new ones. This process helps to extend the life cycle of products and reduce waste by reusing materials, ultimately leading to environmental and economic benefits.

Provide a brief description of the remanufacturing process called Shop-floor systems

Correct Answer

Answered by ExamLex AI

Answered by ExamLex AI

Shop-floor systems in the context of rem...

View Answer

Which of the following statements are not findings of the Core Acquisition Study of Automobile Parts Industry? 1) The quality of the cores acquired is extremely poor in general 2) Arm's length supplier-buyer relationships are popular in the industry 3) The remanufactures are dependent on the core suppliers 4) Product trade-ins are the main source for cores


A) (1)
B) (2) and (4)
C) (1) , (2) , and (4)
D) (4)

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

For the remanufacturing process, _________, the ____________________________ increases the source uncertainty influences.Choose the options that do not correctly fill in the blanks in the previous statement. 1) Detailed capacity planning/ difficulties in accumulating both new and used parts 2) Demand management/ difficulties in order promising 3) Sourcing systems/ risk of shortages from the vendor 4) Resource planning/ difficulties in the accurate forecasting of long-term core availability


A) (1)
B) (3) and (4)
C) (1) , (2) , and (4)
D) None of the above

E) A) and B)
F) B) and C)

Correct Answer

verifed

verified

A

According to the Core Acquisition Study of Automobile Parts Industry, what is the common maximum salvage value of cores?


A) 30%
B) 15%
C) 5%
D) $1

E) A) and B)
F) C) and D)

Correct Answer

verifed

verified

What happens to the cores that do not pass the initial quality inspections in a remanufacturing process?

Correct Answer

Answered by ExamLex AI

Answered by ExamLex AI

In a remanufacturing process, when cores...

View Answer

In your own words, what does differentiate remanufacturing from recondition or recycled products?

Correct Answer

Answered by ExamLex AI

Answered by ExamLex AI

Remanufacturing involves taking a used p...

View Answer

The Remanufacturing Planning and Control Framework can be divided into 3 sections.Which of the following choices correctly matches activity with section?


A) Detailed Material Planning (Front office)
B) Sourcing Systems (Back end)
C) Material and Capacity Plans (Front end)
D) MRP II (Engine)

E) A) and D)
F) C) and D)

Correct Answer

verifed

verified

What is the main source of core for remanufacturing companies?


A) Core brokers
B) Salvage auctioneers
C) Product returns
D) Salvage operators

E) A) and B)
F) C) and D)

Correct Answer

verifed

verified

Which of the following matches between remanufacturing process and associated source uncertainty influences is correct?


A) Detailed capacity planning (Accumulation of both new and used parts)
B) Demand management (Difficulties in the accurate forecasting of long-term core availability)
C) Detailed material planning (Planning difficulties due to stochastic routings and processing times)
D) Sourcing systems (Variable material recovery rates lead to volatile capacity plans)

E) A) and B)
F) B) and C)

Correct Answer

verifed

verified

What happens when the MPS indicates the need for material flow in a remanufacturing process?

Correct Answer

Answered by ExamLex AI

Answered by ExamLex AI

In a remanufacturing process, the Master...

View Answer

Remanufacturing is associated with __________ but not ___________.Fill in the blacks correctly.


A) Recovering/Recycling
B) Recycling/Like new products
C) Recovering/Product life cycle
D) Like new products/Recovering

E) None of the above
F) A) and D)

Correct Answer

verifed

verified

The Remanufacturing Planning and Control Framework can be divided into 3 sections.The ________ process is included in the _____________ section.Fill in the blanks correctly.


A) MPS/Back end
B) MRP/Front end
C) Detailed Material Planning/Engine
D) Sourcing Systems/Engine

E) B) and D)
F) B) and C)

Correct Answer

verifed

verified

Which of the following is not a typical remanufacturing process?


A) Core Inspection
B) Core recycling
C) Core Disassembly
D) Core Cleaning & Disassembly

E) B) and D)
F) All of the above

Correct Answer

verifed

verified

The following statements are descriptions of remanufacturing processes.Choose the statement or statements whose description is not correct. 1) Aggregate production planning (Determining the number of units to be produced in each major product line per period) 2) Detailed material planning (Determining the aggregate capacity to support the production plan) 3) Master production scheduling (Anticipated build schedule for manufacturing end products) 4) Sourcing systems (Providing detailed planning information for supplier scheduling)


A) (1)
B) (3) and (4)
C) (2)
D) None of the above

E) None of the above
F) All of the above

Correct Answer

verifed

verified

The process of _________________ can be described as being a demand decision process which converts used parts into the assembly schedule needed to complete the part.


A) Part Supply Determination
B) Part Inventory Determination
C) Part Return Determination
D) Part Demand Determination

E) C) and D)
F) B) and D)

Correct Answer

verifed

verified

Choose the correct statements regarding cores. 1) In most cases, cores themselves are the finished goods 2) The broker of cores checks their quality before selling them 3) None-durable parts associated with the core are replaced with new parts 4) Most cores are checked in bulk for quality after receipt


A) (3) and (4)
B) (2) , (3) , and (4)
C) (1) and (2)
D) None of the above

E) All of the above
F) A) and C)

Correct Answer

verifed

verified

In applying MRP concepts and logic to the remanufacturing environment, which are the following concepts need to be considered for alteration? 1) Size of the time buckets 2) Sales promotion techniques 3) Bill of Materials (BOM) 4) Safety stock location


A) (3) and (4)
B) (2)
C) (1) and (4)
D) (1) , (3) , and (4)

E) B) and D)
F) A) and B)

Correct Answer

verifed

verified